narrowboatworld
  • Home
  • Information
  • Contact Us
  • Hire Guide

Showing the public

THIS winter British Waterways is giving the public the opportunity to see some of the maintenance to the waterways, with the latest at Hanwell Flight on the Grand Union Canal.
Details
Published: 25 November 2010

Stort towpath upgraded

WORK has begun this week on a £150,000 project to upgrade 220 yards of Stort towpath at Bishop's Stortford.

Details
Published: 24 November 2010

New bridge open this year

UPPER Mills Bridge on the Stroudwater Canal is nearing completion, and should be ready next month.

Details
Published: 24 November 2010

Emergency closure at Wigan

THE emergency closure at Wigan on the Leeds & Liverpool Canal was caused by the collapsed of the retaining structure.

Details
Published: 24 November 2010

Outsourced dredging contract

BRITISH Waterways have outsourced its dredging contract to the marine-based civil engineer Land & Water Services Ltd,  with a contract from next month to March 2015.

Details
Published: 24 November 2010

£33 to wind your boat!

SHOULD your boat be above 50 feet, and you want to wind at the bottom of the Oxford Canal it will not cost you £15 as first stated but £33!

Details
Published: 24 November 2010

Not a maintenance problem

IT IS fairly clear that the problem, which led to the pound between Bedford Staircase Locks and Planet Lock on the Caldon canal having to be drained, had nothing to do with BW maintenance procedures, writes Ralph Freeman.

Details
Published: 24 November 2010

Titford Pump comes home

THE Titford Pump that served the Titford Canal is to be reinstated by its original home on the wharf by Titford Pumphouse at Engine Street in Oldbury.

Details
Published: 22 November 2010

Linton gates go in

AFTER 25 years the gates of Linton Lock were deemed past their 'sell-by' date, and have been replaced.

Details
Published: 22 November 2010

Will anything be done?

THE state of some of the facilities around the waterways has prompted a boater  to contact British Waterways, and she waits to see what reply she gets.

Details
Published: 22 November 2010

Page 1316 of 1417

  • 1311
  • 1312
  • 1313
  • 1314
  • 1315
  • 1316
  • 1317
  • 1318
  • 1319
  • 1320

Latest

  • At last—Atherstone Flight open
  • Whitchurch Breach progress report
  • Canal & River Trust help boatyard to survive
  • Grantham Canal Society to start on restoration of another lock
  • Workers break into roof of tunnel closing navigation
  • Chesterfield Canal Trust at Staveley:
  • Lock closures on the Thames
  • Two weeks of failures
  • Concrete barriers to protect Wrenbury Lift Bridge
  • Warnings to boat owners as 70mph winds set to hit Britain  
  • Irony personified?
  • Now 100 more boats trapped
  • Navigations closed and reopened
  • The Whitchurch embankment failure
  • Two waterways have long term stoppages
  • No access to Ripon Marina—again
  • Base layer of breach completed—then dug up!
  • Movement of boats stopped on the Grand Union summit
  • Straight to the nitty-gritty of the accounts
  • Worry of breach at Nantwich

Search