narrowboatworld
  • Home
  • Information
  • Contact Us
  • Hire Guide

Worries over river marina with solid berths

THOUGH most river marinas have floating pontoons that rise in floods keeping boats safe, there is one notable exception, writes the editor, Tom Crossley.

Details
Published: 22 January 2021

They were a menace

JOE Pullen's article about vandals in the past brought back a few memories, writes James Henry.

Details
Published: 21 January 2021

Storm causing havoc on the waterways

THE storm has caused a further breach on the Shropshire Union Canal and a landslide has closed the Trent & Mersey Canal.

Details
Published: 21 January 2021

Northern canals suffer in flood

IT IS the northern canals that have suffered in the recent torrential rainfall, with damage and debris along the Aire & Calder and  Calder & Hebble river navigations.

Details
Published: 21 January 2021

Where are the 'vandals'?

IN BETWEEN lockdowns last year I once more took to the canals for a boating holiday, writes Joe Pullen.

Details
Published: 21 January 2021

It's better by water!

HERE'S a picture of the Grand Union summit towpath just south of Bulbourne Junction yesterday.

Details
Published: 20 January 2021

Shroppie breach was forseen for over a year!

STRANGE that no-one has reported on the breach at Bridge 80 on the Shroppie, writes Kevin McNiff.

Details
Published: 20 January 2021

Shroppie breach caused by collapsed culvert

AS LOCALS are aware, the breach at Bennett's Bridge  (80) on the Shropshire Union Canal has been caused be a culvert collapse, Canal & River Trust report.

Details
Published: 20 January 2021

Figure of Three locks repair progressing

IT WAS in February of last year that one of the Figure of Three locks was virtually wiped away by Storm Clara.

Details
Published: 20 January 2021

The breach now a leak

WORK is still continuing on the breach on the Shrophire Union Canal below Audlem.

Details
Published: 19 January 2021

Page 475 of 1427

  • 470
  • 471
  • 472
  • 473
  • 474
  • 475
  • 476
  • 477
  • 478
  • 479

Latest

  • The Latest update on the Hampton Bank breach
  • Is the trust cursed?
  • More Customer Service Facility problems
  • Lee Navigation closed for nearly a year
  • Unconnected boat parks
  • Stainforth & Keadby Canal closed again
  • Victor doesn't think so
  • Not cost effective
  • Hampton Bank culvert timeline
  • Paddington Arm oil slick spreading
  • Unconnected boat parks the way forward?
  • Stuck for a year on the Llangollen
  • Shirley Drawbridge still closed
  • Still battling pennywort on the rivers and canals
  • Rotten broken lock beam closes Grand Union
  • Another Llangollen Canal problem
  • Below inflation licence fees for 2027/28
  • Another service failure but three repaired
  • Took the entire season to repair
  • Just public relations exercises

Search