narrowboatworld
  • Home
  • Information
  • Contact Us
  • Hire Guide

Work still not started on K&A breach repair

 
IT WAS way back in October that the Kennet & Avon Canal was brought to an halt at Reading.
Details
Published: 01 December 2021

Does not understand the advice

I ACCEPT that the warnings by the managing director of River Canal Rescue make sense, writes T Lang.

Details
Published: 01 December 2021

Problem logging-on?

THERE have been problems today (Monday) both preventing our uploading and people logging-on to the site.

Details
Published: 30 November 2021

Victor in trouble again!

OUR Victor did not do too well this time, with Trevor Mapstone putting him right by writing:

Details
Published: 30 November 2021

Volunteers have not taken jobs

REFERRING to the following statement by Victor, Giles Williams writes:

Details
Published: 30 November 2021

Big Lock footbridge engineers get award

THE engineers who undertook the repair work on the Big Lock footbridge have won an award.

Details
Published: 30 November 2021

Victor asks 'what are these 'emergency works'?

TIME and time again we are told that the winter stoppage cancellations are due 'to the impact of emergency works'.

Details
Published: 29 November 2021

Now its nine winter works cancelled

THREE more 'urgent' winter works have been cancelled making it a total of nine so far.

Details
Published: 27 November 2021

Coping with extreme weather

THOUGH at present the lack of rain is a problem, soon there will be too much, causing floods.

Details
Published: 27 November 2021

Canal maintenance and repair must be continuous

FURTHER to the observations made by contributor James Henry (narrowboatworld 24th November), I am a little perplexed (understatement), writes Orph Mable.

Details
Published: 25 November 2021

Page 336 of 1357

  • 331
  • 332
  • 333
  • 334
  • 335
  • 336
  • 337
  • 338
  • 339
  • 340

Latest

  • Water, water, everywhere
  • Still no paddles for lock on Glasson Branch
  • More problems at Penkridge Lock
  • Two repairs will take longer than first expected
  • More problems with Bidford Bridge over the Avon
  • Two more 'winter works' cancelled
  • Good news for Canal & River Trust
  • Lee Navigation lock remains closed to navigation
  • CafĂ© turns to cyclists as it has fewer boaters
  • Swing bridge and paddle failures
  • Paddle hubs encourage people on to the Birmingham canals
  • Two more 'winter works' added
  • Source of Chesterfield Canal pollution still not found
  • Keadby Lock is still closed
  • Canal & River Trust's greater enforcement powers is not the answer
  • New top gates for flight lock
  • Bridgewater Canal breach stabilisation completed
  • Maintenance Team volunteers needed
  • Clearing the water on accessible healthcare for boaters
  • Collapsed culvert keeps Staffs & Worcs Canal closed

Search