Limehouse Lock work

Published: Monday, 20 July 2015

SOME of the repair work to Limehouse Lock on the Thames has been carried out resulting in the marina being closed for three hours either side of low water, Kevin Whiles tells us.

 

This enables water to continued to be saved within the canal system. This will continue until further works are carried out at the end of the month.

Very tight

A three hours window does mean that it is possible to leave Limehouse and arrive at Teddington for high water. The Teddington to Limehouse leg is very tight for time and skippers should plan their passage carefully.

Ring Limehouse Marina for more information on 020 7308 9930