THE LONDON & SOUTH EAST area of Canal & River Trust often use vandals as a reason for its stoppages.

ShiptonLiftBridge219But this time it really has gone too far, as Keith Gudgin reports.

For it tells that vandals are suspected of knocking the bridge off its mountings, yet the lift bridge weighs many tons and will need a crane to get it back onto its mountings, providing of course that is the problem.

Closed to navigation

The bridge is down and in the closed position so closed to navigation.

We are told a team has been mobilised to the site to assess the extent of the damage and start work designing a repair solution.