THERE IS A SEVERE RESTRICTION on Boothferry Swing bridge

With one weeks' notice needed for passage, Keith Gudgin reports.

The trust has been advised by East Riding Council that this Ouse bridge over the river has an on-going technical issue that started on the 1st May.

Two or three people

This causing the problem that it needs either two or three people to operate it, but narrowboats do not need the bridge opening.

In view of this one weeks' notice is also needed to obtain staff to operate the swing bridge.  

Boaters requiring passage should contact the bridge operators on 01430 430256 if a passage is required.